NCSU CE
Department of Civil, Construction, and Environmental Engineering
North Carolina State University

Geotechnical / Geoenvironmental Engineering


Research Facilities

The recently completed Constructed Facilities Laboratory (CFL) of the new NCSU Engineering Graduate Research Center (EGRC) contains over 12,000 sq. ft. and includes 30-ft. ceilings with overhead cranes, a 13-ft.-thick multi-cell-box strong floor, and two 24-ft. tall strong walls. A state of the art geotechnical laboratory includes prototype-scale and full-scale test pits and a grouting pit. Advanced testing equipment includes a stress path triaxial testing system, a calibration chamber, and a gas chromatograph and resonant column. In situ testing equipment includes a pressure meter and a Marchetti dilatometer.


Home | General Information | People | Academics
Research | Extension | Related Information

NC State University

Campus Box 7908  ·  Raleigh, North Carolina 27695-7908 USA  ·  919.515.2331  ·  919.515.7908 (fax)

Contact Us